10 Nov Progress at Blythburgh Coal Shed (4)
Work continues. The fencing was completed and the shed floor, a Southwold Railway buffer stop was erected in the shed and the floor was levelled...
Work continues. The fencing was completed and the shed floor, a Southwold Railway buffer stop was erected in the shed and the floor was levelled...
Work continues and we have laid a siding next to the shed in exactly the same position as it was in the days of the...
Work continues at the shed. Danny is pointing the brickwork and we are fencing off the site. Here too are a couple of photos along...